£££ Late Availability Discounts - Click herex

MC/CC 360 Excavator with Attachment Groups 1, 3 and 4

Duration: 7 Days

Max Delegates: 4

Overview

Day 1Introduction to On Track Plant (classroom based)

Day 2 Machine Controller Core Including Material Handler (classroom based)

Day 3Slinger Theory (classroom based)

Day 4 Crane Controller Core Including Crane Controller Excavator Crane

           (classroom based)

Day 5 Machine Controller Practical (site/classroom, machine required)

Day 6 Crane Controller Practical, Including Slinger Practical (site/classroom, machine required)

Day 7 Attachments

C/C Group 3 - Powered Lifting

M/C Group 4 - Transportation

M/C Group 1 - Ballast Management/Track Management

Download PDF